Feßnachbach small hydropower plant
New construction of a diversion-type hydropower plant on the Feßnachbach in the municipality of Scheifling, Murau district.
Here you will find a complete overview of our reference projects. Call us or send us an e-mail if you have any further questions about our work.

New construction of a diversion-type hydropower plant on the Feßnachbach in the municipality of Scheifling, Murau district.

Construction of an overshot carbon-fibre water wheel on the works canal of the Georgnerbach in the municipality of St. Georgen ob Judenburg (Murtal district).

New construction of a diversion-type hydropower plant on the Tiefenbach in the municipality of Mühlen, Murau district.

New construction of a diversion-type hydropower plant on the Fallgrabenbach in the municipality of Mühlen, Murau district.

New construction of a diversion-type hydropower plant on the Rantenbach in the municipality of Krakau, Murau district.

New construction of a diversion-type hydropower plant on the Weiße Sulm in the municipality of Wies, Deutschlandsberg district.

Rehabilitation of a diversion-type hydropower plant on the Perchauerbach in the market town of Neumarkt in der Steiermark, Murau district.

Rehabilitation of a diversion-type hydropower plant on the Ötzbach and Brücklerbach in the municipality of Turnau, Bruck-Mürzzuschlag district.

New construction of a diversion-type hydropower plant on the Eisenhutgrabenbach in the municipality of Schöder, Murau district.

New construction of a diversion-type hydropower plant on the Seebach in the municipalities of Aflenz and Turnau, Bruck-Mürzzuschlag district.

Development of effective flood protection solutions for the village of Seebach in the municipality of Ranten, Murau district.

New construction of a diversion-type hydropower plant on the Wöllbach in the municipality of St. Georgen ob Judenburg, Murtal district.

Rehabilitation of a diversion-type hydropower plant on the Tauernbach in the municipality of Hohentauern, Murtal district.

Rehabilitation of a diversion-type hydropower plant on the Feistritzbach in the municipality of St. Peter am Kammersberg, Murau district.

New construction of a diversion-type hydropower plant on the Schwarzenseebach in the municipality of Kleinsölk, Liezen district.

New construction of a diversion-type hydropower plant on the Kranzbach in the municipality of Gaal (Murtal district).

New construction of a diversion-type hydropower plant on the Flitzenbach in the municipality of Gaishorn am See, Liezen district.

Construction of a diversion-type hydropower plant in Romania (Bistrița-Năsăud county).

In June 2013 our office completed the final report on the work package “Sediment transport modelling”, carried out as part of the INTERREG project DRA-MUR-CI (cross-border water management initiative for the Drava and Mura rivers), covering the numerical flow modelling of the reservoir of the Feistritz-Ludmannsdorf hydropower plant on the Drava.

Construction of a diversion-type hydropower plant in the Erzberg mining area in the town of Eisenerz (Leoben district).

New construction of a diversion-type hydropower plant on the Möschitzbach in the municipality of St. Peter ob Judenburg (Judenburg district).

Construction of an overshot water wheel on the Wöllbach in the municipality of St. Georgen ob Judenburg (Murtal district).

New construction of a diversion-type hydropower plant on the Grießbach in the municipality of Pruggern (Liezen district).

New construction of a diversion-type hydropower plant on the Bretsteinbach in the municipality of Bretstein (Judenburg district).

The first results of work package 2 – flood scenario catalogue for the Drava – carried out jointly by PI Mitterfellner GmbH and Verbund are available and will be presented together with the Carinthian provincial government.

New construction of a diversion-type hydropower plant on the Lorenzerbach in the municipality of St. Georgen ob Murau (Murau district, Styria).

Rehabilitation of a diversion-type hydropower plant on the Möderbach in the municipality of St. Oswald-Möderbrugg (Judenburg district, Styria).

New construction of a diversion-type hydropower plant on the Liesing in the municipality of Wald am Schoberpass (Leoben district, Styria).

New construction of a diversion-type hydropower plant on the Krumeggerbach in the municipality of Oberwölz-Umgebung (Murau district, Styria).

New construction of a diversion-type hydropower plant on the Feßnachbach in the municipalities of St. Lorenzen bei Scheifling and Scheifling (Murau district, Styria).

New construction of a diversion-type hydropower plant on the Gastlbach in the municipality of Schöder (Murau district, Styria).

In cooperation with the Carinthian provincial government and the University of Natural Resources and Life Sciences, Vienna (BOKU), sedimentological calculations are being carried out with a numerical flow model for the reservoir of the Feistritz-Ludmannsdorf hydropower plant on the Drava as part of work package 3 of the INTERREG project “DRA-MUR-CI”.

A diversion-type hydropower plant was built on the Katschbach in the municipality of Schöder, Murau district.

As part of work package 2 of the INTERREG project “DRA-MUR-CI”, hydraulic calculations for a flood scenario catalogue are being carried out with a hydrodynamic numerical flow model of the Drava, based on design flood hydrographs defined by the Carinthian provincial government.

New construction of a diversion-type hydropower plant on the Feistritzbach in the municipality of St. Peter am Kammersberg, Murau district.

Determination of stage–discharge rating curves for Carinthian rivers by means of numerical flow modelling, commissioned by the Carinthian provincial government (Department 18 – Water Management, Hydrography Unit) for use in the “Carinthia” flood forecasting model.

The software KWKW.opt®, used to optimise the energy efficiency of small hydropower plants, was completed in August 2010 and has been in use at PI Mitterfellner GmbH ever since.

The project “Drava-Mura-Crossborder Watermanagement Initiative” (DRA-MUR-CI) was approved in 2009 by the programme authority under the European Territorial Cooperation (ETC) programme Austria–Slovenia.

For hydropower plants, our office offers all services required for their construction:

On behalf of the Styrian provincial government, a 2D flow calculation is being carried out on the Donnersbach in the Liezen district.

Under the Austrian research programme “NEUE ENERGIEN 2020”, we received a funding commitment for our software project “KWKW.opt® – optimising the energy efficiency of small hydropower plants”.

In cooperation with the Austrian Service for Torrent and Avalanche Control (Upper Mur Valley area office), several options for achieving protection against a 150-year flood (HQ150) are being developed for the Moosplattenbach in the municipality of Teufenbach.

New construction of a diversion-type hydropower plant on the Schöderbach in the municipality of Schöder (Murau district, Styria).

Following repeated damaging flood events, the municipality of Schöder commissioned our office to develop a general concept for flood protection measures on the Siechenbach.

Construction of a demonstration hydropower plant in the municipality of Krakauschatten.

The municipality of Frojach-Katsch commissioned PI Mitterfellner & Wlattnig GmbH with the technical, commercial and water-law construction supervision of the planned flood protection on the Katschbach – consisting of a flood wall and a flood embankment – on the orographic right bank of the Katschbach in Katsch.

Construction of a hydropower plant on the Einachbach in the municipality of Predlitz-Turrach.

Numerical modelling of the hydropower cascade on the Austrian Drava.

Construction of a hydropower plant for the Rupert Ferner riding farm in the municipality of Mühlen (Jakobsberg).

During the construction of small hydropower plants and flood protection measures, we were commissioned by the Styrian provincial government and the district authorities of Murau and Judenburg with the water-law construction supervision of the following projects:

On behalf of the Styrian provincial government (Department 19 Water and Waste Management, Section 19B Flood Protection), the water-law and nature-conservation permit documents for various measures are being prepared within the LIFE-Nature project “Inner-Alpine river corridor management on the upper Mur”:

The municipality of St. Georgen ob Judenburg has extended its street lighting in Pichlhofen with solar lights.

The municipality of Stadl-Predlitz commissioned us to carry out the third-party inspection of the Predlitz-Winkl, Predlitz-Turrach and Einach water supply systems.

Design including water-law permit application and preparation of an operating and marketing concept for an aquaculture facility in St. Peter ob Judenburg.

Design including water-law permit application for an aquaculture facility on the Salchauerbach in the municipality of Oberwölz, Murau district.

Construction of a water supply system for the Steiner development in Dürnberg, municipality of Seckau.

On behalf of the municipality of Laßnitz bei Murau, we carried out the design including option study, tendering and site supervision for a firefighting water intake on the Mur to cover the firefighting water demand of the St. Egidi business park.

As an engineering consultancy for rural engineering (Kulturtechnik), we are authorised to carry out technical inspections under § 134 of the Austrian Water Act (“third-party monitoring”).

New construction and rehabilitation of spring catchments and pressure-reducing chambers, and installation of a telemetry system for monitoring the elevated reservoirs.

Development of 3 new springs, construction of an elevated reservoir and renewal of the pipe network.

The cooperative Nahwärme Unzmarkt-Frauenburg eGen. is planning a district heating plant to supply the villages of Unzmarkt and Frauenburg.

Extension of the Mariahof water supply system in the Vockenberg area.

Construction of an elevated reservoir and the associated pipelines, and rehabilitation of the associated spring catchments.

On behalf of the Wöll water cooperative, we are digitising the water pipe network.

Construction of an elevated reservoir, spring catchments and the associated pipelines.