HEP operators Kraftwerk Rössleralm GmbH plans the construction of a small hydro power plant and commissioned PI Mitterfellner with implementation planning, detailed planning, local building supervision and overall management of this project. The Rössler small hydro power station is located on the Gastlbach river in the town of Schöder and is designed as a diversion plant. The generated energy is fed into the local utility company’s mains grid.
Client and operator:
Kraftwerk Rössleralm GmbH
Service period:
2008 – 2011
Leaflet (German language):
KW Rössler