Mr Siebenbäck planned the revitalisation of his small hydro power plant and commissioned PI Mitterfellner with approval and implementation planning, detailed planning and overall management of this project.
Mr Siebenbäck's small hydro power station is located on the Möderbach river in the town of St. Oswald-Möderbrugg and is designed as a diversion plant. The generated energy not required for own usage is fed into the local utility company’s mains grid.
Client and operator:
Georg Siebenbäck
Service period:
2010 – 2011
Leaflet (German language):
KW Möderbach